Pay in 4 interest-free payments of $44.62 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 8 - Aug 13
Pay in 4 interest-free payments of $44.62 Learn more
Ships within 48 hours · Estimated delivery Aug 8 - Aug 13
The locomotives were principally designed for freight work but also saw service on summer passenger trains where train heating was not required
the arrival of more powerful diesel locomotives
all over Maunsell dark SECR grey with large lettering and also standard SR pre-1936 brown
Fully detailed interiors with First/Second Class seating
Set contains 735 pieces
176-4375-DCC EMD NW2 Switcher AT&SF 2412 - DCC-Fitted option-set-w-wagon-1-40 The locomotives were principally designedEMDs NW2 switchers lifetime was nearly cut short just three years after its introduction, with the establishment of the War Production Board in 1942, which dictated that EMD was to halt all production of switching locomotives, manufacturing only road diesels during the years of 1942 to 1945. However, such was the popularity of this end cab switching locomotive that after the restriction was lifted, the NW2 sprung back as many railroads placed orders
US$ 9999.50
US$ 8499.50
US$ 25122.00
US$ 19027.00
US$ 14750.00
US$ 10000.00